Friday, August 27, 2010

Romancing the Metre Gauge in Monsoon(Akola-Indore MG trip)




What do you do when your meticulously planned rail fanning trip washes away due to incessant rains? Immediately plan a new rail trip to some other location and find solace. A few rail fans from in and around Kalyan had planned a Shiradi Ghat trip during the 1st weekend of August 2010, but the amount of rainfall that had battered the Konkan coast ensured that the timetable goes for a toss as landslides were reported from Adavali and unfortunately the line remained closed for more than 10 days. Even-though transshipment of 6345 Netravati Express was done by Konkan Railways, there was no guarantee of reaching Mangalore right in time to catch the outgoing 6516 Mangalore-Yeshwantpur Express. We decided to dissolve the plan and opt for a Metre Gauge (MG) trip from Akola to Ratlam. Unfortunately, many of our group members couldn't muster enough time for this trip, so yours truly and Shantanu kulkarni teamed up to do this trip and enjoy the scenic MG section before it is taken up for gauge conversion.


All the tickets were booked in hush-hush. Shantanu managed to book twin berths for 2111 Amravati Express from Kalyan to Akola Jn and 458B Akola-Ratlam passenger. We had planned to return back from Ratlam by 2472 Swaraj Express after an overnight stay in Ratlam. But as this was not a preplanned trip, we had to rely on tatkal bookings for this section. By the time, we managed to reach the counter, tatkal quota had exhausted and the only other alternative readily available was the super crawler 9024 Firozpur-Janata Express. We decided to tweak our plan to get down at Indore (INDM) and catch the 9310 Indore(INDB)-Gandhinagar Express for an overnight journey and then catch 9116 Bhuj-Bandra Terminus(BDTS) express from Vadodara(BRC). These last minute discussions meant we were booking tickets online on 5th August at 23:00 hrs over the Irctc website, when our journey was to commence on 6th August 2010.

This was going to be my first overnight trip with a rail fan, a trip which was spanning over 3 days, but I had a wonderful person for company in Shantanu Kulkarni. Not only did he share his immense knowledge with me, he also corrected me whenever I was wrong. Kudos to you boss for making my trip a memorable affair to remember.


As we were boarding the 2111 Amravati express from Kalyan at 21:03hrs, I left my home (Dombivli) at 19:30. Took a share auto to the station and reached platform No. 1 by 19:45.I knew that there was a Kalyan Semi fast departing Dadar at 19:01, hence decided to wait for its arrival in Dombivli at 19:52 as any other local train would have been difficult to board, for that time of the day. As I was approaching Kalyan (KYN), 2 expresses, one with WDM3D and the other with a WCAM3 sped past me in the opposite direction. As the train was very crowded I could not peep out to note the train name/numbers. After slowly negotiating the turnouts, my EMU came to a halt on Platform No. 1 at KYN. The skywalk being built by MMRDA was nearing completion and was already being used by commuters. It was 20:05 and I had an hour to spend at the station, so decided to venture out on the Skywalk network. I climbed the FOB and walked a few meters towards the south end and few meters towards the north end of the KYN West Skywalk and was amazed to see the whole network of the skywalk. I became sure that a complete study of the skywalk would easily take an hour, so decided to ditch the idea and return back to the station to observe more interesting trains. While I was getting down on Platform No 4, I saw the 2128 Pune-Mumbai Intercity Express glide pass the edge of Platform No 7 silently behind a WCAM3. Below the newly built FOB is the place where reservation charts for outgoing trains is pasted. There were four rows of reservation boards placed perpendicular to the platform edge. The reservation charts for 2105 Mumbai-Gondia Vidharbha Express and 2137 Punjab Mail were already put up. At 20:15, Vidharbha express entered pf 4 behind KYN 21951 WCAM3 and 2860 Howrah-Mumbai Gitanjali Express arrived on pf 5 behind KYN 21963 WCAM3 at 20:20.




Soon, a huge crowd gathered near the reservation charts and I found that the board was being updated and reservations charts for 2111,2322,8029,7057,2163,1011,2527 and 1017 were put up filling up all the four rows. After the crowd became manageable, I ventured to confirm our berth nos to be S4, 35(Upper berth,UB) and 40(Side Upper berth, SUB). Interestingly, the chart also mentioned our coach to be 5th from the engine and was a CR00026 coach. Having confirmed our reservation, I decided to walk up the length of the platform and found a black board mentioning the departure of 2101, 2151 and 2809 from their respective terminals (CSTM/LTT) at 04:00am till 11th August 2010. Post Gitanjali Express' departure came the 1068 Faizabad-Mumbai Saket Express behind another KYN WCAM3. In the meanwhile, 2137 Punjab Mail made its presence felt on pf 4 with KYN WCAM3 21981.


I called up Shantanu to know his whereabouts and he mentioned that he had reached the station complex and was getting down from the FOB. He also mentioned that a railfan, Karthik Gopalan from Chembur was waiting to meet us on the same platform. Soon we managed to meet him and exchange tit-bits about the Mumbai Suburban sections, MRVC locals and many other things, which typically make us railfans passionate about railways. He seemed to be very happy to finally have the lone 9 car MRVC 1041-42 rake back on track on the harbour line. It was taken off service for a few days and was spotted by yours truly and many others at Matunga sidings. After a few MRVC locals bound for the south-east lines used pf 4 for their scheduled halts at KYN came our 2111 Mumbai-Amravati Express, hauled by KYN WCAM3, 21894. We had to walk back as the train halted at least one coach earlier than its normal position. We managed to keep our bags on our berth and bid good-bye to Karthik. We left within 5 minutes and slowly criss-crossed the South-East bound lines and negotiated the DC-AC neutral zone outside Kalyan North. Shantanu pointed out the Electric loco shed and the many WCG2s waiting inside the shed for scrapping. We decided to stand by the door of our coach, though not much was visible outside, discussing how Bhor ghats were longer and more interesting than Thull ghats to watch during day time. We reached Kasara, a technical halt for our train at 22:15 and KYN WAG7 triplets were attached at the rear end as bankers. Then started the slow and steady ascend up the Thull ghats to reach our first commercial halt at 22:45. We were berthed on pf 2 and pf 1 was occupied by 2137 Punjab mail. It had got twin bankers in KYN WAG5, which was detached by now. We decided to venture to the front of our train to see WCAM3 detachment and WAP4 attachment. As our WCAM3 was detached and moved into the loco escape line ahead, Punjab Mail with Ghaziabad WAP1 22072 was given the go ahead at 22:50. It had waist level head lamps. After wait of 5 more minutes, a Bhusaval (BSL) WAP4 22680 came to take charge of our train. Both of us returned back to our berths and our train left at 23:08. We decided to hit the sack as we had a wonderful MG journey awaiting us in the morning.We had reached Nasik Road at 23:50 in a matter of 42 minutes. As we had to alight at Akola Jn(AK) at 6:05, I kept an alarm of 05:00 hrs and went to sleep on the SUB, Stantanu being taller decided to occupy UB. Whenever I woke up in the night, I found our train to be running, so safely assumed that we would reach Akola on time and went back to sleep again. Our coach was a well maintained one, the mirrors had markings of 2010-11, but one of the fans in our section was making a loud noise, which was put off later by one of the fellow commuters. As it was drizzling outside, temperature inside the coach was cold enough to stay put without a fan. I noticed that Shantanu had woke up at 4:40 and spotted Malkapur, 8 minutes before time. I woke up at 5:00 am, freshened up and spotted Shegaon at 5:30. As we were approaching Akola Jn, we spotted Maharashtra's oldest Thermal Power Plant, Paras in the distance. There were freight lines running away from the mainlines to the power plant. It was drizzling and the twin cooling towers of the plant were surrounded by clouds. It was truly a wonderful scene to start the day with. We reached Akola Jn at 6:15 and even though it was raining, I ran towards the loco to catch a glimpse of our WAP4. As I was taking a snap of our loco, the LP said, “ Arre hum ne kya paap kiya...hamaari bhi photo lona yaar.” (Why don't you take our snaps, we haven't committed any sins). I was thrilled to hear this and obliged them by taking their snap. I wished them a good day ahead walked back into the platform shelter.









After 2111 left Akola, we strolled down the Pf 2 towards Bhusaval to have our first look of the MG on offer. In the meanwhile SRC WAP4 22272 arrived on platform 1 with 2810 Howrah Mumbai Express. On the through lines was Jhansi based BHEL WAG5 24098 waiting with a long BCNHS rake in blue livery. As we didn’t find any tea vendor in 2111, we approached the refreshment stall on PF2 for 2 cups of tea. Even though the tea offered was nothing great to write home about, I must admit, it was the sweetest tea I had in my whole life. It was hot sugar water. As both of us wanted some change, we decided to offer Rs 100 to the refreshment stall personnel. Surprisingly, he did not object and happily returned Rs 90 back.


One look towards the North West side of the station gave us a clear glance of the MG yard at Akola. There were a few red liveried Accident relief wagons, a crane on flat bed and a few passenger coaches. We also spotted an inspection car in blue livery. Our 458B Akola-Ratlam Fast passenger was berthed on pf 5, though without an engine. It had markings of Western Railway (WR) and only 3 reserved coaches (S1-S3) and the rest of the train had Unreserved (UR) coaches totaling 11 in all. Some of the coaches had a rebuild marking of 1998 and 2004. We moved into our coach S2, where we had booked berths 29 and 30. To the uninitiated, a typical MG sleeper coach has a seating capacity of just 48 with 3 doors on one side and lavatories at both ends. The middle door forms the median of the coach, splitting it into 2 sections of 1-24 and 25-48, with 6 seats in a bay and 4 compartments in each section. As it is smaller in width and height as compared to a conventional Broad Gauge (BG) coach, there is no space for side seats and the corridor is on the side. The coaches were non-vestibuled, but the berths had satisfactory cushioning, contrary to our perception. The UR coaches were of course without any cushions. Soon a YDM4 started chugging from the adjacent pf and moved ahead to reverse back into our pf line. This was my first sighting of an MG loco and it impressed me with its chugging. It had a sweet honking sound and was doing so while reversing back to couple with the rake. Shantanu educated me that Ratlam based BG diesel locos and Mhow based MG diesel locos shared similar liveries of Red-White-Black. The loco doing the honors for the day was MHOW 6300 YDM4.


The coupling procedure looked so simple to the naked eyes. The hook got entangled to the rake automatically as the loco reversed back. The couplers were CBS styled. I must admit that I don’t know the technical name for such coupling. Railway personnel moved in to connect the vacuum pipe. That’s it, we were ready to depart. There was scanty rainfall, since the time we had arrived at Akola and the rake was soon filling up with people. By the time we left there were about 25 commuters in our coach. The UR coaches too were sparsely populated. We were feeling hungry and the only eating options available on MG platforms were kachoris, being sold by an old man limping along the platform. We decided to buy a plate of kachoris and, they were delicious. We couldn’t resist buying another plate. They were crisp, inspite of the misty weather. The masala inside the kachoris seemed to have a blend of garlic and a few unknown spices. It tickled our taste buds for sure.



We saw a TTE waiting under the asbestos roofed portion of the platform. Shantanu began discussing with him the intricacies of an MG journey and the TTE believed that the MG route might go on for another year, inspite of the guage conversion news doing the rounds. When we told him that we were here to only enjoy the MG ride, he discussed the Neral-Matheran and other NG routes. He seemed to be very passionate about steam engines. Further on our journey, we found him to connect well with the passengers as well as the railway personnel on the varied stations enroute.


In the meanwhile, we spotted 8410 Ahmedabad-Puri Express with ED WAP4 22555. At 7:31, with a long hoot, our Mhow 6300 started chugging out of Akola on my maiden journey of MG. Awaiting us were one of the best hinterlands in the heart of Incredible India. Akola Jn had electric signals, but the entire route ahead had semaphore signals. The MG lines move away from the BG lines at Akola with a 90 deg curve facing Bhusaval. As our coach was sparsely populated, both of us were at the luxury of peeping out from any of the 6 doors. But it was drizzling and we were trying to soak in the romance of MG trains. Enroute we saw 3 small stations, Ugwe, Gandhi Smarak and Patsul. Even though, these stations weren’t on the list of scheduled halts, our train did make brief halts and the TTE did use this opportunity to hop into the next coach to verify the passengers’ tickets. He also warned us that some UR passengers might try to enter the SL coaches, so we were better off keeping the doors locked at stations. But the railfans in us never missed the opportunity of getting out in the open whenever we halted at stations. The route was full of green vegetation. Very few human habitats could be seen. The only people who could survive here were farmers as there are no industries or the infrastructure to support them.


At KM Marker 698, we reached our first commercial stop, Akot at 8:45. We left at 8:57. The route had many TSR and PSR of 15kmph and 20kmph. We never ran at MPS. The condition of the track under SCR left a lot to be desired. At Hiakhed, we spotted “CR” markings on the iron window grills of the waiting room. All the stations had the typical look of being the epicenter of the village it sustained. The common features at all the stations were the station master’s office, booking counters, a namesake waiting hall, a token wielding railway personnel waiting to handle over the badminton racket shaped token exchanger to the Loco Pilot(LP), semaphore signals and its controlling levers. We did notice a few BCNA styled MG goods wagons, Flatbeds and cabooses’ rusting in the siding lines of few stations. In all probability, freight is no longer being hauled in this section, even though T/G and caution signs for Goods as well as Passenger traffic existed all along the track. Some stations had 1957 engraved in Devnagri script just below the station name. It was really worth noting that all stations enroute were using solar panels for lighting. Its food for thought for major stations in metros where we have so much of electricity being used for lighting up the platforms in the night.

MG crossing at Wan road from nikhil on Vimeo.






After Hiakhed, started the ghat section, we were slowly going up the hills and YDM4 was showing no signs of fatigue. It was pulling the rake amazingly well but for the many speed restrictions imposed in the section. We reached ‘Wan Road’ at 10:00 and confirmed with the LP that the wait was going to be a long one for a crossing. We kept ourselves busy by capturing the pictures of our train from various angles. We also saw the manually operated levers to change the tracks and signals. It was indeed engrossing to see all of these happening as we don’t get to see such operations in Mumbai suburban network. One might need special permission to reach the RRI cabins at stations in Mumbai. Here everything was happening in public domain. We gathered enough courage and decided to ask our LP the permission for foot plating on the locomotive. He understandably denied it as we were totally strangers to him. We appreciated his sense of responsibility and decided to go back and not bother him anymore. After another Mhow YDM4 with Ratlam-Akola passenger crossed us, we started the journey again into the hilly terrain. After KM Marker 655 started the famous ‘Wan Loop’, we managed to capture a video of the same. The entire loop was covered in little over 4 minutes. It’s a marvelous piece of engineering and a must watch. Only once you reach exactly below from where you started on the ‘Wan loop’ does it sink in. Back home we do see trains going up and down the Kopar loop, but this was something special.


WAN Loop on Akola-Ratlam Metre Gauge Section from nikhil on Vimeo.






After Wan loop, Shantanu decided to take a break and rest for sometime on the UB. It was a slow paced journey through, Dabka, Thuthikad and Ratnapur. There is an iron girder bridge across an unknown river before Ratnapur, which we crossed at 11:55. We left Gurhi at 12:35 delayed by more than an hour and 15 minutes. We reached Takal at 12:50 and Khandwa(KNW) at 13:40. We had reached KNW, late by 40 minutes and we had a crew change here. As we were approaching KNW, the BG double electrified lines from Mumbai passed below our tracks to come back and join us at KNW. The BG station though visible from MG side of the station is separated by a few stabling lines. The station was chaotic. There were many people loitering on the platform. There were cows relieving themselves on the platform and vendors selling food. It resembled a market place. It was lunch time and we were travelling light hence we decided to munch on some Puri Subzi and AluWada-Sabzi. The Puris and Aluwadas were just about okay. The subzi again was a watery/oily affair with Potatoes and green peas. We left within 15 minutes and were now travelling in WR territory. We reached the next three stations, Ajanti at 14:10, Attar at 14:30 and Koltakheri at 14:50. We crossed RTM-AK passenger at Ajanti. The train was touching 60-70 KMPH speeds in WR territory but never MPS of 75, though, it was much better than SCR section. Shantanu remembers spotting a few metres of a new bridge with ballast laid. We reached Omkareshwar road at 15:30 and it was pouring cats and dogs by then. There were many passengers awaiting our train at this station. There was an information board on the station asking the pilgrims to alight there for the famous Shiv temple.

crossing narmada river in heavy rains at omkareshwar road from nikhil on Vimeo.




The halt at Omkareshwar was a small one, and since it was raining heavily, many UR passengers tried to barge inside the SL coaches. We did try to stop them from entering the reserved coaches by directing them to the other UR coaches, but a few unrelenting passengers barged in and tried occupying our berths. Luckily, the new TTE who had boarded at KNW was still in our coach. As soon as we left Onkareshwar road in drizzling rain, we could capture the gorgeous Narmada River flowing under the bridge. Soon the TTE came asking the UR passengers for their tickets and a travelling party of 2 tall and sturdy gentlemen and a lady who had forcibly occupied our seats, tried to intimidate the TTE by saying that they were from the army. Our TTE too was equal to the task and he said in no uncertain terms that they will have to get down at the next stop and board another coach as being a military personnel they should understand discipline better and should behave themselves. TTE also retaliated by saying that if they did not intend to get down then he will have to take action against them and that he was quite a disciplinarian. TTE was impressive in his way of tackling unruly passengers and he deserved special praise.


The next thing on our agenda was the Ghat section of the Vindhyas. It started 2 stations before Kalakund. We were slowly going up the incline. The rains had subsided by now and as we were approaching Kalakund, we could spot another YDM4 from the Mhow stables warming up for banker duties on the adjacent track. Kalakund was a scenic station on the curve. As the banker loco had went to reverse into our track. Many passengers had climbed up on the roof of the UR coaches. They were perched on top in spite of enough space available in the train. After successful banker coupling, we started on the fantastic climb up the Vindhya Range. The next 30 minutes were the best part of the journey. We encountered the picturesque ghat section, with mountains, valleys, viaducts, four tunnels, many rock cuttings, rivers and one breathtaking waterfall to end the section at Patalpani. Now we know why the station was named so. I would recommend this Ghat section for any rail and nature lover alike. There is so much on offer, especially in the rains. We could see many love birds (couples) perched atop the mountains facing this breathtaking waterfall and discussing their future. The banker was detached and we reached Mhow, the biggest MG station on offer at 18:00, one hour late by now. Mhow had a huge MG passenger yard and diesel loco shed. Water filling and crew change was scheduled at Mhow. We had ‘Poha’, recommended by Dombivli based IRFCAN, Abhishek Tamhankar. It was indeed good to taste. We saw a Ratlam-Mhow passenger on pf 1; we were put on Pf 2. Pf 3 was empty but, soon there was an announcement of Mhow-Ujjain being shunted into Pf 3 by yet another YDM4. We were given the go-ahead at 17:50.



We were expecting time recovery of about half an hour between Mhow and Indore Metre Guage(INDM); but again we had to stay put for more than 30 minutes at Rajendra Nagar to allow a INDM-Mhow Local to cross us. At Rajendra Nagar we spotted MG on concrete sleepers. We expected the concrete sleepers to be designed for dual guage for the impending BG conversion but they could only sustain MG rails. The scenery outside was slowly and steadily resembling the outskirts of a city. Soon we were entering Indore MG station, late by 45 minutes. We contacted Ruchir Sharma, IRFCAN from INDB, but he couldn’t meet us due to heavy rains.


YDM4 6605 at rajendra nagar with mhow local from indore from nikhil on Vimeo.






Indore BG and MG co-exist on Pf 1-3 and Pf 4-5 respectively. We decide to venture out as the next train we were supposed to catch had a scheduled departure of 22:45. The INDB station complex looked good from the exterior. YP 4028 is plinthed right in front of the station complex. We were dumb-struck by the grandeur of the steam engine. As the RPF guys were standing right next to it, we did not take a chance in photographing the steam loco. Outside the station, there was enough space for private vehicles to drop in and pick-up passengers. There were CNG autos and Tata Magic pick-up vans awaiting commuters. As it was raining incessantly and we were short of an umbrella we couldn’t venture out much. Shantanu’s shoes had given away after the whole day doorplating on the MG trains and we were desperately searching for a shop selling sandals. After a few random enquiries he did manage to settle for a nice pair of sandals. The next thing on our mind was to buy some Kalakund for Abhishek Tamhankar. All the eateries we enquired, were selling everything other than Kalakund.


We roamed around the bus-stand and found that it was busy with tour operators shuttling between Indore-Ujjain and Indore-Bhopal. There was a large city map inside the bus-stand. There were many restaurants in and around this area proclaiming to provide vegetarian thalis at reasonable cost. It was too early for us to decide for dinner, and our carry bags were taking its toll on our shoulders, so we decided to keep our bags in the cloak room and venture out on the other side of the station for Kalakund. The cloak room was a nondescript place on the platform no 1. We tried to bring the attention of the cloak room keeper to our bags, but he was busy counting money and was least interested in listening to us. On further insistence, he took out the register and started noting down our tickets details and after the formalities were over, he asked us to lock the bags and keep it in an iron grilled room. This is when we told him that we were not carrying any locks and that he could keep it the way they were. But he said that he will not take the risk for any loss of articles from the bag and hence will not allow us to keep the bags in the room. Dejected, we made our way the other side of the station by crossing the FOB. This side was relatively quiet and instead of restaurants and sweet shops, we came across a large number of hardware stores selling everything from auto parts to concrete mixers. We returned back to the station and took pictures of the BTP wagons, the MG counterpart of BTPN wagons. The MG section of the station was busy with shuttles plying to and fro between Mhow and Indore. Finally we went back to the side where we had seen the YP loco plinthed, to have some dinner.


Dinner was ordinary. Shantanu ordered for a Special Veg Thali and I opted for Veg Pulav. The veg pulav turned out to be veg fried rice. The dessert for the day was gulab jamun. Adjacent to this restaurant we found a sweet shop, where Kalakund was available for Rs. 200 per kg. We went back to the station. We had about 1.5 hours to spare and decided to walk the length of all the BG platforms and study the various BG rakes on display. Habibganj-Indore intercity had just arrived on pf 3. It was hauled by RTM WDM-3A 16159. It had many coaches in Karnavati livery. On the adjacent pf 2, 2973 Indore-Jaipur with a scheduled departure of 22:30 was already berthed, ready to be hauled by BGKT WDM-3A 16276. The day long travel through the hinterland had drained out our mobile batteries and we saw the opportunity of recharging in the AC coaches of INDB-JP. It had a 3 tier AC and a Hybrid 2A/3A combo. That gave us an opportunity to see the interiors of the hybrid coach. After sufficient recharging of the mobiles, we made our way to pf 1, where our train, 9310 Indore-Gandhinagar Express was ready with RTM WDM-3A 18608. In the distant night sky we could see catenary poles reaching INDB. As we had a scheduled departure of 22:45, we knew that we would trail INDB-JP till Ujjain.


We had middle (60) and upper (61) berths allotted in S2 coach. One look at the reservation chart, made it very clear that the coach was full of passengers bound for Vadodara(BRC). As our co-passengers booked on 2 Lower berths got upgraded, we missed no opportunity to occupy them. Later in the night 2 passengers did turn up but they understandably went to sleep on the MB and UB. We left at 22:45. Both of us were on the lookout to see the diamond crossing between BG and MG and were fruitfully rewarded to see that happen after a small station, Laxmi-bai Nagar. We were moving very fast and reached Dewas Jn by 23:25, delayed by only 3 minutes. Shantanu was already asleep by then. After a brief nap, I woke up to the announcement of Indore-Jaipur departing from Ujjain. We too had a loco change here and assumed that we must have left with an AC loco which we were to discover at BRC, to be a BRC WAP4. At 5:40am, I woke up to see our train entering the curved platforms of Godhra Jn. We were delayed by 20 minutes. At BRC outer we spotted a train with coaches in mixed livery of Duranto and Karnavati. It went past us in a relatively high speed and we couldn’t trace its whereabouts, but it was a very short rake. We saw the BRC avoiding bypass lines to Ahmedabad(ADI) and the lines from ADI to BRC forming a triangle. We managed to reach BRC at 6:45 and were berthed on pf 6 which resembled to be a relatively new platform, for being isolated from the rest of the station. It seems to have been built at the northern end of the platform no 1 with a dead end. Fortunately, they have designed a loco escape line for the loco to move ahead, reverse into the escape line and recouple at the other end of the same rake.


We walked all the way to Pf 1 and found that our train 9116 Bhuj-Bandra Sayajinagari Express was delayed by half an hour and was expected only by 8:00 am. Pf 1 was full of passengers awaiting various trains heading down south to Mumbai. We approached the refreshment stall and had some ‘Dhokla’ and ‘Puri-Sabzi’ each costing a mere Rs. 10. We went out to see the exteriors of the station complex and it was larger in scale as compared to Indore. We returned back to pf 1 in a few minutes and waited patiently for the arrival of Sayajinagari Express. We noticed a huge fish tank installed in the station premises. It was a welcoming sight. There were a few parents keeping their kids busy by explaining them the different species of fishes on display.

In the meanwhile, we saw a WAG9 slowing coming to a halt on pf 6 with 2948 Patna-ADI Azimabad Express. It was my first time of spotting the monster WAG9. It was in a traditional green livery and belonged to AJNI, numbered 31221. By the time we reached the end of pf 1, a delayed 2934 Karnavati Express arrived behind a WCAM2 at 7:45. The WAG9 on pf 6 detached itself from the rake, moved forward and reversed back into the loco escape line to again re-couple at the other end of the rake for its forward journey to ADI. After 2934 left, PAS announced a 2 hr delay in the arrival of our train 9116 Sayajinagari Express. 9109 Valsad-ADI, Gujarat Queen arrived on pf 2 at 8:05. Another BDTS bound Ajmer/Udaipur Express hauled by BGKT diesel arrived on pf 1. This train had a loco change to WCAM1 at BRC. We were in 2 minds to whether wait for 9116 or board 2996. In the end,it left without us. By now, we understood that trains were reaching ADI late due to heavy rains on the previous night. Finally, we decided to catch the next train out of BRC. At 8:20 Ernakulam-Okha Express hauled by ERS WDM-3A arrived on Pf 4. At 8:40, 9066 Jodhpur-Bandra arrived on pf 2 with a diesel loco. The last few SL coaches, S11-S14 were literally empty. We didn’t want to miss it, so we boarded the train and made ourselves comfortable in side berths having emergency windows facing the trackside. Since, we didn’t possess tickets for 9066, we decided to approach the TTE waiting on the platform to appraise him of our situation. He advised us to board the train and said that he will attend us after the train departs BRC. We were jubilant and returned back to our earmarked seats. There was no loco change for our trains and it was going to be a diesel affair through a Double electrified section.



At 08:55, we left BRC and we had the entire coach at our disposal. There was a petrified stray dog in our coach. It must have boarded the coach to take shelter from the rains. It was trying to look outside from the door, but the train was moving too fast for it to disembark. Not that I am a great animal lover, but felt pity for the creature, which was shivering perhaps in the fear of being relocated. The TTE arrived and he said that tickets of 9116 cannot be considered for travelling in 9066 and we will have to pay the fine and travel or get down at the next stop and wait for 9116. We decided to pay the fine and it worked out to be Rs. 870 for 2 of us. We also relocated to S9 seats 23/24, again side berths with emergency windows facing the track side. Since the travel by 9066 was not on our agenda, we were clueless of its stoppages. But we were in for a pleasant surprise. It had only Surat, Valsad and Borivali as its commercial stops. I must say, it was a complete paisa vasool. Rajdhani styled stoppage pattern for a non-superfast train. Wow….!!!


We were commuting on the BRC-BVI section for the first time, and noticed that it had 4 aspect signaling and tracks ran dead straight for most part of the journey. There were 2 chain pulling instances, one each at Bharuch outer and Udhna outer. We crossed Narmada River once again near Bharuch Jn. This time though it looked far muddier than yesterday. Our co-passengers asked us if we intended to buy some food items at Surat as he was phoning up the ‘Food Express’ based on Pf 1 at Surat. He said that they hand delivery the ordered items right in your coach and the food is delicious. We declined his invitation as both of us were feeling full after our breakfast at BRC. We reached Surat at 10:45 and left within 5 minutes. We crossed the mighty Tapi river, which was also brownish in color. At Surat, the caterer did approach our co-passenger with his order. He provided us with the menu card and the gourmet of food available on the menu did look good. They also have a website: http://www.foodexpresssurat.com/ . You can book order food online too. Interesting isn’t it? The pandrol clips on the washable apron of Surat platforms looked slightly different from the ones used across the IR network.




On the adjacent track we could see a continuous stream of WAG7/9, WAM4, WCAM1 with freights and passenger trains. We were clocking good speeds as were whizzing past most of the stations at MPS. We had some tea, biscuits and bhel enroute. There was no respite from rains and our decision to board 9066 looked extremely satisfying. We slowed down after a long time near Auranga bridge, where a TSR of 20 kmph was seen. Finally, reached Valsad at 12:00 noon and didn’t bother the section controllers for long, as we departed within 2 minutes. A new-looking ICF-LHB hybrid AC coach shell only; without glass panes, seats at BL side lines were spotted by Shantanu. We crossed the Daman Ganga Bridge near Vapi at 12:20. I was waiting to see the first station across the state border and was fruitfully rewarded to see Bordi (Maharashtra) fly fast us at 12:42.We ran nonstop through Dahanu Road. The areas around Dahanu River, Golvad and Dante were all resembling to be flooded. The next big attraction was the full speed blast across the twin Vaitarna bridges. Shantanu showed me the hillock from where our Mumbai members capture the videos of speeding Mail/Express trains. After entering the EMU section at Virar, where we slowed down, I freshened up to get down at Virar and missed on the opportunity to capture the Vasai creek bridges. Shantanu spotted BDTS-DEE Garib rath with TKD WDM at Bhayander. We slowed down after Dahisar and entered the new platform 6A at 14:05. The entry to Platform 6A was so slow and noisy that at some point we felt that our train might derail, because of sharp turnouts.

Approaching vaitarna north bridge from nikhil on Vimeo.




Vaitarna South Bridge from nikhil on Vimeo.








As we live in the far north eastern suburbs of Mumbai, we decided to catch the Vasai Road (BSR)-Diva Jn DMU departing BSR at 15:35 as the journey could have been much more comforting than the crowded EMUs from BVI to Dadar(DDR) and again Dadar(CR) to Kalyan(KYN). As I was carrying the Mumbai Suburban Smart Card, purchasing tickets for BVI to BSR was a mere ritual. We were about to depart for BSR by slow local at 14:15. At the refreshment stall on the platform, we bought 2 glasses of fresh lime soda to quench our taste. By the time we could finish it, a Virar sllow local was ready to depart. We boarded it and got seated by the time we crossed the DC-AC neutral zone. By 14:35, we reached BSR after crossing the twin Vasai Creek bridges. We waited on the C shaped FOB over the tracks at BSR for sometime as we could see a MEMU, TKD WAG-9#31207 with concor rake waiting in the yard. Aamod Nerurkar and Aadil Sheikh joined us on our journey back home till Kaman Road for railfanning. At 15:10, WAG7 with the freight load moved towards JNPT via Kopar and PNVL. Our DMU arrived at 15:25 and there were equal number of people waiting to alight and board at BSR. But, by the time we were about to leave, there was enough space for everybody. We decided to door plate. The Mumbai-Ahmedabad Highway, and Ulhas Creek Bridge are the famous attractions on this route.At Kaman Road, we bid goodbye to both, Aadil and Aamod and continued our journey to Kopar. The DC substations at all the stations enroute had been abandoned and IR is still to demolish them. It seems they will continue to exist for future generations to take note of them. Our KYN WDM2 17492 was smoking very well. At Bhiwandi a hordes of commuters got in, only to get down at Kopar. In the far south, one can see the tall skyline of the emerging New Thane. We alighted at Kopar at 16:30 and Abhishek Tamhankar was waiting to meet us. After a few minutes of chit-chat, he departed and we boarded a Titwala bound MRVC local. I got down at the next stop, Dombivli and Shantanu continued up till Kalyan, thus bringing to end a wonderful round trip. This journey will be etched in our memories for years to come.

Thank you all for being super patient to read the longest trip report I have ever written.

Thursday, August 12, 2010

2 days, 2 unusual controlling of EMUs

I am a regular commuter of the last fast of the day 23:18 Ambarnath from CSTM. Since the past 2 weeks, the DC rake has been replaced by an MRVC rake. The 0111 Konkankanya Express which departs CSTM at 23:05 halts at Platform No 5 at Dadar and Platform No 7 at Thane. The fast EMU normally overtakes 0111 at Thane or Dadar. On few days, when 0111 is already ready to depart from Platform no 7 at Thane, the fast EMU is diverted on the slow track from Thane, taking the longer route and running on the slow lines right uptil Kalyan as there is no traffic on slow lines at that point of time. Most of these runs are interesting as even though our EMU is put on the longer slow track, we are still the first ones to reach Diva outer as 0111 takes time to negotiate the turnouts out of Thane with its customary 24 coaches.

On 10th August, starter was given for 0111 and simulatenously we were put on the slow track, so I was expecting to catch parallel action at Diva outer, but we were in for a surprise. As we approached Diva outer we were switched back onto the fast track and 0111 was still untraceable. I am sure that 0111 had not gone ahead as we were very fast between Kalva and Mumbra with the MRVC rake. I am sure there was no block on the slow track as I waited at Dombivli to see if slow tracks indeed have trains coming from CSTM side. Indeed there were slow down locals arriving on Down Slow platforms.


On 12th August, the 11:58 Fast from DI to CSTM was delayed by more than 35 minutes.Even I was running late and missed the DI starting 11:59 slow local to CST. Hence I decided to take chance and boarded 12:13 Slow local to Thane. After travelling comfortably for 22 minutes I got down at Thane and decided to catch the next fast train coming on Platform no 6. While we were reaching Thane, I had seen Chennai- Mumbai departing from Thane. Luckily, by the time I changed platforms, the same fast local arrived, relatively empty as the regular commuters might have ditched it for the day after listening to the delay announced by PAS. As it was raining, the window seat was empty and I made it my own after wiping the seat clean. As we were trailing Chennai-Mumbai, I was expecting a slow down after Matunga or possibly a wait at Dadar Outer. Surprisingly, we were put on Platform no 5(loop) as Chennai-Mumbai was berthed on through Platform no 6. We also overtook it.

Tuesday, June 22, 2010

7 trains moving at the same time on 7 tracks at 7 am at CSTM today

It’s been a few months since the 7th line to Mazgaon yard from CSTM had been laid and used for shunting empty rakes from CSTM and back. I commute daily to CSTM from DI and always wanted to see action happening on all 7 tracks simultaneously. At the most I had seen 6 tracks being used by running trains but never 7 at the same time. But today my prayers were answered.


I had caught the 5:57 am Fast local to CSTM from DI. After KJT-Vangani section went AC, a MRVC rake is used for this service. The local was before time today and we left at 5:56 am and All Green was the signal right until Thane outer we sped past Kopar, Diva, and the Parsik Tunnel and finally slowed down and entered Platform No 6 at Thane. We reached at 6:06 am against the scheduled time of 6:10 am. I got down and rushed to Platform no 4 to catch a Thane starting slow local at 6:10. I normally do that to travel with comfort as well as gaze at the M/E trains that whiz past me on the UP and Down fast tracks. As we stopped at Sandhurst Road lower, I could see a harbour UP local approaching Sandhurst Road Upper level station. On the 7 line from the yard, I could see a KYN WDM2 pulling an empty rake of Pushpak Express to CSTM. It was slowly negotiating the turnout of the yard to get into the 7 line. As we started moving towards, Masjid , the UP harbour line local was descending the ramp. Soon we were joined by a WCAM3 21949 hauled 2116 Solapur-Mumbai Siddheshwar Express on the UP fast track. Now we had 4 trains moving in the UP direction. From the corner of the eye, I could spot a DC EMU rake bound to Panvel on the Down harbour line approaching the ramp along with a Down slow train to Thane on the Down slow track. Now we had 6 trains running side by side and I just wanted the Down fast track also to see some action to see my long cherished dream succeed.


To exceed my expectations, a WDP4 20059 with LHF was pulling out Mandovi Express out of CSTM with its 24 coach load. Yes, that completed the much awaited dream. By the time we stopped at Masjid. I was sure that both WCAM3 hauled Siddheshwar Express and WDM2 hauled empty rake of Pushpak express must have got a RED at Masjid as point were not yet cleared by the outgoing Mandovi Express. As soon as Mandovi Express cleared the points, another sight was awaiting me. Both the trains were given an Amber. Pushpak was slowly moving towards the new platforms 16/17 or 18 as I don’t know where it was finally parked. Siddheshwar was running parallel to it on the adjacent line to terminate finally on Platform no 9 and my slow local made its way to platform no 3 at CSTM. It was indeed a good start to the day and I expected a good day at office too. The controllers at CSTM had done a commendable job.

Friday, June 18, 2010

It happens only in Mumbai locals

It is that time of the year when rains batter the Mumbai locals with full thrust. We have a local folklore which goes as follows;” The only thing that can stop Mumbai locals is heavy rains”. As we are already into the monsoon season, the hawkers of mobile phones plastic covers are doing brisk business in the trains. As usual, I was commuting to my office by a Slow local to CSTM for an afternoon shift. I was surrounded by a group of Gujarati traders who get in mostly at Mulund and Ghatkopar and get down at Masjid. They are a real menace, for the amount of noise that they make in the compartment.


A small boy, all of 9-10 years entered our coach at Byculla and started selling plastic covers for cell phones. This group of 7 traders bought one each and after paying off Rs 35 for 7 covers @ Rs. 5 per cover, they were happy that they have managed to buy the covers at dirt cheap rate. As each of them were trying to put their mobile phones into the newly purchased plastic covers, it dawned upon them that out of the 7 , 2 were already torn and by the time they could catch hold of the boy, he had got down at Sandhurst Road Lower. The train had also started moving by then. Many of us within the compartment couldn’t control our emotions and burst into laughter. The 2 unlucky traders however rued the fact for being the butt of everybody’s jokes.

Friday, June 4, 2010

Why is it so difficult to speak the truth?

Since time immemorial, elders have preached the young to speak only the truth, at any cost. Even though they themselves aren’t following the path, they want their off springs to be truth worthy. So why is it so difficult to speak the truth? I will never find answers to these questions…..·

What is the temptation that allows one to follow the wrong path?
Is it the excitement of getting away easily?
Is it the way of telling people around you how clever or street smart you are?
Is it that you are a coward?
Is it the agony of being reprieved for something which you are responsible?
Is it so important to save your face?
Is it necessary to blacken someone else’s face to protect your identity?
Is it the fear of being caught in the act so less that you are ready to brave it, if and when caught? Are you doing it for the sake of fun or is it serious business?
Are you born with it or learnt it while you grew up?
Is it your upbringing or the circumstances that made you commit the crime?

Saturday, May 29, 2010

TTE helps in recovering the bag of a WT traveler

It was a sultry Saturday afternoon and as usual I was commuting by a 9 car DC EMU from Dombivali to CSTM to do an afternoon shift in office. I was travelling in the Kalyan End First Class. The journey was monotonous as usual, until a TTE made his presence felt in the compartment. I think he boarded at Mulund and soon managed to catch a second class ticket holder in the corridor itself. As soon as we reached Bhandup, the offender was made to get down from the train along with the TTE and he was asked to shell out money for the offence. All of us inside the compartment were interested in seeing the action outside. As the EMU made its way out of Bhandup station, Someone noticed that a bag was lying in the corridor and after a few curious glances at each other, we arrived at a conclusion that the offender had actually forgot to take his Bag while alighting at Bhandup.

As we reached Vikhroli, someone from our compartment screamed out to the RPF on the platform No 1 to bring this to his notice, but as we had halted only for a few seconds, nothing could be done and the RPF reciprocated saying that he will inform RPF at Sion to collect it. As we reached Ghatkopar, all eyes were looking out for men in Khaki, but no one was visible, same thing followed at Vidyavihar. A few restless commuters tried calling up Railways Protection Force’s Emergency line 022-22620800, but in vain. I could see a few even trying the CR SMS facility. As we reached Kurla, another TTE walked straight into the compartment and took the bag which was still lying in the corridor after a confirmation with the fellow commuters that this was the bag which was left by the offender. He informed us that he was a TTE himself and was instructed by his colleague to collect the lost bag.
Everyone heaved a sigh of relief and our journey continued………(though no RPF turned up at Sion for the bag)

Sunday, May 16, 2010

My Beloved Window Seat Journey to Office

I stay at Dombivli (DI) and commute daily to Chhatrapati Shivaji Terminus Mumbai (CSTM) to reach my office at Cuffe Parade. A total of more than 100 kms per day in travelling by all modes of transport including autos, EMUs and BEST buses. The longest part of the journey is covered in the EMUs. Catching a train from Dombivli and securing a seat is next to impossible for a dombivlikar during the rush hour. The only way to secure a seat during rush hour is to travel back to Kalyan Jn. and traverse the same journey back from Kalyan to Dombivli to CSTM, which eats up more than ½ an hour from your daily schedule. There are thousands of commuters who do this day-in and day-out. I am very lucky in this regards as we have 2 shifts, ‘morning’ and ‘afternoon’. The crowd is manageable at 6:00 o’clock and at 1:00 o’clock and there is no need to travel back to Kalyan to secure a seat.

Sundays are different, we have a 9:00-21:00 hrs shift and that means I have the luxury of catching the peak hours’ fast trains and still manage to position myself by the window to catch a glimpse of trains and everything related to railways. Most often, I position my elbow on the window to support my head and go to sleep due to sheer fatigue. Today, I was feeling very fresh even though I had reached home at 01:45 in the late night after taking the last Kasara local which departs CSTM at 00:15. Hence, I decided to spot the trains on my way to the office. I know there would be many railfans who would love to do this daily, but mind you the commute really takes a toll on your life.

I left home at 7:20 and took a share auto to Dombivli and reached the station by 7:35. On all weekdays I talk the Kalyan End FOB and walk straight to platform no 3 to catch the local, but Sundays are different, I alight on platform no 5 and take the fast train. The next scheduled train was a 7:43 fast local to CSTM, I walked up to the Middle First Class and the train arrived sharp at 7:43. It was an MRVC rake. A quick glance into the coach meant there were no window seats available. I decided against boarding it and try my luck with the next fast local. As the EMU left the station, Mumbai –Pune intercity blasted past us from the adjoining down fast line with a WCAM3 at its helm. Unfortunately, the next fast local scheduled was 7:58 and that meant I would reach office late, so I quickly checked the status of Platform No 3 indicator which had a fast train scheduled at 7:50.

With no second thoughts I took the middle FOB and by the time I could alight on platform no 3, the MRVC 2169 series had arrived a full 5 minutes before time. The CSTM End First Class was relatively empty and I managed to secure my beloved window seat facing the 5th-6th lines. We waited for the clock to tick 7:47 and left 3 minutes early against the scheduled departure of 7:50. I don’t recollect where I read this, but it specifically mentioned that all EMUs can leave the stations en-route 3 minutes prior to actual scheduled time except the starting station. So it seems the motorman and guard was adhering to it. In the meanwhile, a WCAM3, 21944 with the Shalimar-Lokmanya Tilak Terminus Express sped past us on the UP fast tracks. We too joined the race, put couldn’t match it and soon the express won the race. We ran without stopping at Kopar (a paradise for high speed action seekers and freight lovers). You can spot almost everything here with the added attraction of trains criss-crossing at different levels and a triangle in the vicinity. In the far end, I could spot a container rake with caboose on one of the arms of the triangle which goes to Vasai Road, the loco was not visible, most probably it would have been a WAG 5/7.

As we were fast approaching Diva Junction, we managed to meet our competitor WCAM3, 21944 with the LTT bound Shalimar being hauled into the loop platform no 3 at Diva. Was it for an overtake, by an EMU or an Express, I would never know. Soon we were coasting through the platform no 2 at Diva and brakes were being applied by the motorman to reduce the speed of our EMU to crossover to the UP Fast Tracks just after Diva Jn. I could spot at least 300 people waiting on Platform No 5 & 6 awaiting the various non-suburban shuttles that operate from here. The minuscule siding line at the Parsik Tunnel end of Diva had an idling Kalyan(KYN) WDM3A. After we managed to successfully negotiate the crossover points at less than 20 kmph, motorman started accelerating and Mumbra Creek Bridge and Parsik tunnel were traversed at a very good speed. I don’t carry a GPS but rely on the OHE poles to calculate speed, so there is bound to be some deviation in my calculation of speed. Soon the double track line from Vashi was approaching us from the east. It stays by our side right until Thane. There does exist a crossover point, but not used by locals trains as of now. A Vashi bound DC rake crossed us on one side and on the Down fast tracks, Deccan Express sped past us. All in all, the relative speeds experienced were amazing on both sides.

We came to a halt on Platform No 6 at 8:00 against the schedule time of 8:03. On Platform No 7 was the monstrous WDP4 with 0103 Mumbai-Madgaon Mandovi Express. The scenes inside the train were pretty similar to what fellow IRFCAn Abhishek Tamhankar had described on the IRFCA email forum. The train was choc-a bloc with passengers bound for Konkan and Goa. Reserved as well as GS compartments looked alike. We left at 8:02 and slowed down drastically near Kopri Overbridge as the sleepers and the ballast are being replaced in this section. All along the track, we can spot jute bags filled with the debris of the track work. The substation work for AC changeover is progressing well at Kopri. We departed Mulund at 8:06 against the scheduled departure of 8:07. A WDS6 shunter 36239 was spotted at the line which terminates at Mulund Goods Terminal, which is being developed in a big way. Numerous sidings have been built over the period of 2 years for the same. We came to a standstill somewhere between Mulund and Nahur for a minute. On the varied sidings, a KYN 13619 Shakti with empty flatbed rake, a Kurla (CLA) WDS4 19699 with Harsco Track Technology machines and concrete sleepers loaded on Flatbed with another WDS4 could be spotted.

Now we were literally crawling past points one after another due to Temporary Speed Restrictions (TSRs). In the meanwhile a WCAM3 with an unknown express crossed us on the Down fast line. We managed to cross Nahur only by 8:15. Delays had crept up into our schedule and now we were actually running late. The famous TATA Truck on Rails was idle on the 5th Line at Bhandup. The motorman was trying to catch up with the schedule and we were running close to MPS by the time fellow IRFCAn Vijay Aravamudhan’s office at Kanjur Marg was traversed. As we went past the LC gate at Vikhroli, the new LC gate was ready but was not commissioned and the vehicles were allowed to stay put near the old LC gate on the east side near the UP fast tracks.

We again lost speed and started crawling after the Road over bridge (ROB). Re-plastering of the old DC Traction Sub-station (TSS) at Ghatkopar seems to be completed. The 5th-6th lines work is pending at the northern end of Ghatkopar. Tracks need to be laid. There is also a loop line here, which was first brought to my notice by Shantanu Kulkarni. We departed at 8:25 against the scheduled time of 8:19. Again at Vidyavihar the track work of installing the crossovers to fast track lines seems to be in a limbo. CR authorities had admitted their inability in completing the work by June 2010 due to lack of slots for megablocks at Vidyavihar till the Holiday season is over as most of the summer specials run by CR start and terminate at LTT. So don’t expect the services till October 2010. Inside the Vidyavihar trip shed were twin WCG2s, a WCAG1 and a few WCAM3. WCAG1s have been a common sighting this season with a host of summer specials. The Vidyavihar yard had a coal laden goods rake and numerous coaches waiting to be scrapped. It’s a junkyard for Central Railway (CR). We were soon approaching Kurla and a few things that keep bothering me about this station is the gross neglect of the Platform no 9. Why is CR adamant on not using it for EMU shuttle services between Kurla-Panvel or maybe Kurla-Vashi-Thane. I am sure there will be demand for it. The crowd on Platform no 7 and 8 at rush hours is maddening. It is not that Platform no 9 was never used. I remember traveling with my mom to Mankhurd and then by BEST bus 501 Ltd to Vashi in the late 80’s.The rail bridge was under construction and the only way to reach Vashi was the old road bridge or take a State Transport bus detour from Thane. The BEST 501 Ltd is now running on a different route. With Bandra-Kurla Complexes’ proximity to Kurla, the commuters of harbor line deserve this shuttle services as the train from CSTM via Wadala are already filled to the brim. Also there has been no news on the Grade separator design for the freight line which leads to the oil companies at Kurla East. Will it remain a promise unfulfilled? Only time will tell.

We had reached Kurla by 8:30 against the scheduled time of 8:25. On the siding lines were 2 small OHE vans, ‘Godavari’ in Yellow face and Green sides livery and ‘Kaveri’ in the traditional Green/Blue livery. After we left Kurla, a WDP4 hauled Udyan Express to Bangalore sped past us. The EMU was running very close to MPS as I could see Sion go past us. We slowed down after Matunga. A freshly painted 12 car DC rake was visible in the bushes of the Matunga yard, and so were the 3 SWR Shatabdi livery coaches. They have been resting there for some time now. Platform no 7 had a visitor coach today, an Inspection Car was coupled to the rear of the incoming Yeshwantpur-Dadar Chalukya Express which was hauled in by WDMx. A WCAM3 was stuck between the rake and the end buffers of the Platform No 7. Poor guy!

We reached Dadar at 8:36 against the scheduled time of 8:32. There was a 12 car DC rake waiting for a north bound journey on Platform No 5. The Platform No. 6 has undergone a few silent changes, like granite walls near the Station Manager’s Office and the tiles on the flooring have changed. The fluorescent signages have been put up. After we left Dadar and went past Parel workshop, we were zooming at good speed. Parel Workshop has turned into a haven for industrial locos, we have spotted locos from Vishakhapatnam Steel Plant, Bhilai, Rourkela and a host of Kalyan Shakti WDG3A. It augers well for the future of Parel Workshop. Chinchpokli sidings had the CSTM-Karwar Triweekly Superfast express. This train has the best timings for an overnight journey to Madgoan, CSTM dep at 22:15 and reaching Madgaon by 07:30 with very few stoppages. What more could you ask for? I hope the Mumbai-Ernakulam Duranto AC biweekly announced in the rail budget adheres to this timing for CSTM dep, which will make it possible to reach Ernakulam by next evening at Duranto speed. All trains departing from Mumbai to Kerala are in the day time. It would be interesting to see a late evening departure, whereby people can go to office and then come back to board the train You see I can work one more day.. (I am ready for brickbats guys. Please start throwing…hehehehehe..)

We reached Byculla at 8:40 against the scheduled time of 8:38.As we left Byculla, there was a temporary loss of power to the fans in the coach just as we went past the Byculla Bridge. Did the pantograph go down too low resulting in loss of power? God knows. Nagpur Duranto was stabled in the Reconditioning Depot at Mazgaon. That is where it rests all Sunday morning. I have often seen it there. At the Wadibunder coaching depot, I could spot 4 WDS6 shunters and one CLA WDM2. Soon we went under the Rail Bridge at Sandhurst Road. The 7th line to the yard from CSTM has come up in a very good way. CR is utilizing it for empty rakes movement with shunters. After yet another WDP4 with Kolhapur bound Koyan express cleared the way for us, we negotiating the 25 kmph turnout at Masjid. Had to stay put at CSTM outer for 3 minutes and finally managed to reach CSTM by 8:51. The CSTM yard was full of coaches of all configurations, right from the Inspection cars, Janshatabdi coaches, plain SLRs, to rakes of the already arrived Siddheshwar Express from Solapur. A total of 9 WCAM3 could be spotted as far as my eyes could see along with a few diesel locos from various sheds in India, mostly from Kalyan, Erode and Kazipet to name a few.

I did not waste time in roaming around the station. Ventured out and caught hold of the BEST 138 to my office located at Cuffe Parade, reaching there by 9:10 thus bringing to an end to a fruitful railfanning journey by my beloved window seat.

Nikhil Padinjaroot Karunakaran

Sunday, March 21, 2010

Commuting into the Eye of Megablock.

For the last few weeks I had been observing the work of slewing of tracks for the additional 7th line work between CSTM and Wadi Bunder Coaching Depot. Once this line was made functional, the innmumerable trips of empty coaches to and fro between the above said location would have shifted to the 7th line thus freeing up the fast corridor and help maintain punctuality.


On Saturday, 20th of March 2010, Central Railway (CR) put up huge notices in the local newspapers informing the general public about a 16hr Megablock, curtailing most of the Mail/Express services upto Dadar. I was doing second shift in office and while going to the office located at Cuffe Parade, I had noted that the work was indeed progressing at fast pace to meet the Sunday night deadline. Most of the sleepers for the 6th line track was in place and OHE and connection work was pending. While returning back, at 23:40 by the Ambarnath slow local, I had spotted a few laborers lying on the idle track. They must have been relaxing for the hard work on Sunday. As luck would have it, I was scheduled to return back to work at 9:30 am in the morning for a grueling 12 hr shift. But I didn’t mind it as it would have meant traveling into the eye of the Megablock when the track work starts.


Got up at 6:45 am and was all set to leave for office by 7:50 am. Took an auto to Dombivali Station and reached it by 8:05. I climbed the Kalyan end Skywalk to see the status of the indicators. There was a 8:07 Fast to CSTM scheduled on Platform no 5 and a 8:21 slow local to Kurla, which was of no use to me. There were repeated announcements of the megablock and all Dombivali locals were cancelled for the day, as reiterated by the blaring announcers on the Public Address System (PAS). I knew, that many Thane, Kurla, Dombivali locals would be chopped off the timetable today to reduce the headway near Matunga, as fast trains were supposed to be diverted to Slow lines from here.


I decided to alight on the platform no 5 and walk all the way to the CSTM End First Class.the platform was fairly crowded. The 8:07 fast was delayed and crowd was swelling up. At 8:12 got a glimpse of the MRVC rake moving towards us from the far end of Thakurli. The MRVC was 2149 and we left at 8:13. I made it a point to sit near a window facing the east side, as that would have given me insights into the track work at Masjid, even though, it meant getting the sun rays hitting you straight in the eyes . As soon as we left Dombivali, the motorman cut loose the beast in the MRVC and we managed to reach Thane at 8:24 all in a matter of 9 minutes against the scheduled run of 13 minutes. It’s truly a pleasure for a rail fan to enjoy such high speeds in a suburban section. Near the Parsik Tunnel, I could hear the WDP4 go past us with the Mumbai Madgaon Mandovi Express. As we waited at Thane, the PAS declared that our train will have halts at Mulund, Bhandup, Vikhroli, Ghatkopar, Kurla and Matunga and will continue to run on the slow track for the convenience of the fellow commuters after Matunga. The progress of 5th-6th line on the Thane-Kurla section was evident from my window seat. It looks good to achieve the June 2010 deadline, though work near Vikhroli needs to catch up. As we were making the halts mentioned above, I noticed some ‘Track Renewal Machines’ at the Mulund sidings. Don’t ask me the use of it, but I can safely guess that it’s there for the 5th and 6th line tracks work, if not anything else. Another WDP4 went past us in the opposite direction and that must have been the Mumbai-Bengaluru Udyan Express. I didn’t understand why we ran non-stop at Sion as it does have a platform on the fast tracks, albeit a 9 car capable. May be the compulsion of a dual halt would have dissuaded CR from doing so as most of the fast trains nowadays are 12 car. On the subject of dual halts I must say that the dual halts have been successfully abolished from Masjid a few weeks back.


We had managed to reach Matunga outer at 8:46, which was not bad considering the number of additional halts we had, but then started the crawl. We waited for a few minutes before managing to crossover to the Slow UP lines. After the Matunga halt, I was all the more excited to see the action through the grilled windows of the MRVC local. And soon started the action; first was the SCR rake of the Hyderabad Hussain Sagar Express lying idle in the loop line between Platform 7 and Platform 6 of Dadar. Preceeding it was a Yellow-Green livery WDS6 shunter from Kurla. As we entered platform no 3 at Dadar, the chaos on platform 4 and 5 was clearly visible. The place resembled a swarm of bees. There were RPF personnel manning the long line of commuter waiting for the Pushpak Express expected on platform no 5. The crowd was as usual uncontrollable. The Mumbai Kolhapur Mahalaxmi express was resting on platform no 6. As we left Dadar, spotted a WDS6 ready to shunt the Mahalaxmi Express rake alongwith the idle WCAM3 (panto down). Also, spotted a WDS6 with idle WCAM3 and the entire rake of Pushpak Express making its way to platform no 5. It was really interesting to see the WCAM lying dead sandwiched between a shunter and a 24 coach rake.


Soon behind it followed a WDMX with an empty rake which consisted mostly of blue livery coaches with an exception of few coaches in white/blue with red stripe livery. I think, it could be the Koyna Express. As we went past the Chinchpokli sidings, spotted the empty rakes of Mumbai-Karwar Triweekly Superfast and Janshatabdi rake (indented for the afternoon run to Aurangabad). We stopped at Byculla and as we were slowly making our way to Sandhurst Road, we spotted the Mumbai-Nagpur Duranto coaches lying idle at the Mazgaon Reconditioning Depot, also spotted a number of WCAM3’s with their pantographs down and resting in the yard. WDS6 is running the show today between CSTM and Dadar. After Sandhurst Road, spotted CR’s ‘Kaveri’ the miniscule OHE van below the Sandhurst Road (Upper level)station on the Fast Up tracks. There were broad Red flags on both the fast lines indicating a complete cease to traffic on these lines. There were laborers working at mutilple levels. Some were involved in digging, slewing, OHE work, carrying mechanical equipments, and there were huge number of Engineers guiding them. There was a huge makeshift pandal erected on the eastern side for the officers to relax at the location where the 7th line breaks off into the yard. It would be safe to assume that more than 200 laborers are involved. At Masjid end of the fast tracks was CR’s ‘Godavari”, another OHE van. The entire CSTM yard looked a deserted. The only rakes visible were the Mumbai-Amravati Express, Solapur-Mumbai Siddheshwar Express, GM observation coaches, and a few spare coaches of various configurations which have been lying there since ages. Only 3 WCAM3 were visible. I alighted at 9:13 am. Not bad at all for we managed to cover the distance between Dombivali and CSTM within 1 hr with so many additional stoppages, it was like a reverse Semifast local. Exciting times ahead for all CR guys…Hope to see the shunters with empty rakes on the 7th line in the next 2-3 weeks as the final work of connecting the 7th line to CSTM Mail/Express platforms need to be completed by then.

Happy railfanning……

Regards,
Nikhil Padinjaroot Karunakaran

Thursday, February 11, 2010

All I could do was laugh...

This is a real incident that happened on the CSTM bound fast train which departs Dombivli at 12:37hrs. I was commuting to my office for the afternoon shift starting at 14:00 and this train serves me well as it reaches CSTM by 13:30. The 12:37 fast is actually a MRVC local which starts from Kasara and gets fairly crowded by the time it reaches Dombivli. Today, I was late to reach the station, hence decided to get into the Kasara end First Class instead of the CSTM end First class I am accustomed to.


The EMU arrived at 12:38 and I safely boarded it and gave my bag to a gentleman standing in the passage between the seats to place it on the rack overhead. As there were no seats available, I decided to stand behind this person. After Diva Jn, the person sitting on the 2nd seat vacated and I was lucky enough to be seated even before Thane arrived.


There was an old man who was occupying the coveted Window Seat and he had a briefcase on his lap. As soon as I sat, he opened his briefcase and took out a small paper bag which was neatly packed. I thought, he planned to have snacks, but he did not unwrap it and kept holding the same for a few seconds. As the EMU was slowly making it way to the Mumbra Creek, he gave this paper bag to a person standing on the footboard and gestured to throw it.


Many Hindu rituals insist on throwing the remains of floral decorations of deity in flowing water and I have seen many commuters going up to the footboard to throw them into the Mumbra Creek Water.


The person standing on the footboard, oblivious of what the old person sitting on the window had gestured, threw the paper bag even before the train could reach the Creek Bridge. The old man saw this and was enraged. He started arguing with the person on the footboard, about the premature dropping of the paper bag. The footboard guy in return said that, he did not know that the old man wanted to throw it specifically in the creek and thought that it was his leftovers and wanted to throw it out of the train. All I could do was laugh .....


NIKHIL

Saturday, January 16, 2010

Kerala Special Sojourn on the New Year's Eve







My mom had some work in Thrissur, Kerala, hence I had booked tickets, for her, to and fro journey on 25th Dec 2009 and 8th Jan 2010 respectively by Mangala Express from Kalyan(KYN) to Thrissur(TCR) and back. I and Dad were to stay put in Mumbai. Dad was not interested in spending the New Year in Mumbai especially since the last 3 years he had been celebrating it in Kerala. We decided to surprise everyone by arriving in Kerala on 31st Dec 2009.

Hence, as soon as the Winter Specials were announced, I quietly booked tickets for myself and Dad on the 0165 Dadar-Ernakulam Spl for the 30th Dec 2009. I normally book tickets via the I-ticket format, even though E-ticket is preferred by most who book tickets online. Others may disagree with me, but I have found the seat preference is not always met in E-ticket. But with I-ticket I have always seen that my preferences are met. While booking, I opted for 2 window seats in SL when the availability was more than 100. As expected I got two Lower berths allotted, 41 and 44 in S8. The basic idea of 2 Lower berths is to have access to window at all points in time during the journey, be it day or night, plus the added advantage of having 2 views, one in the direction of wind and one opposite to it.

We had finished with our packing and as the departure time from Thane was 13:30 hrs, we decided to leave home at 11:30 to catch the 11:59 CSTM bound Dombivali local. The 11:59 local often arrives on platform no 2 by 11:40. I have a habit of studying the pattern of the Mail/ Express train that I am bound to travel in the near future. I had seen that the 0165 was being pulled by KYN WDG3A in its previous journeys and used to arrive on platform no 7 at Thane by 13:12 and waited till 13:30 as the Mumbai-Hyderabad Express overtakes from the platform no 5.

Please excuse me for not noting down the loco numbers and their respective sheds as railfanning for me is more about the journey than about the locos involved. I like the way, the scenary passes through as we traverse the vast landscapes of our country. I try to take down the arrival timings at various stations and like to study the crossing trains enroute.May be I am still a novice at that as the breed of railfans we have in IRFCA is truly phenomenal.

We had boarded the CSTM end First Class of the 11:59 local and as we were approaching the Thane creek, saw a WDM3D driven 6345 Netravathi Express making its departure from Platform no 7.We arrived at Thane on platform no 4 at 12:20. We had a trolley suitcase, a backpack and a small bag to carry along with us, hence decided to take the ramp and alighted on platform no 7 by 12:30. I exactly knew the location of my coach, still confirmed the same with the Coach Position indicator board on the platform, and also noted our names on the chart displayed. The platform was relatively empty. Soon Manmad-LTT Godavari Superfast arrived and most of the train emptied out here. I could not understand the purpose of making it halt here instead of platform no 6 as no overtakes happened; neither was any local expected on platform no 6. Godavari Superfast left within 2 minutes. After a few minutes, Chennai-Mumbai Mail/Express arrived on platform no 6 with its customary red liveried RMS coach. This train has dual halts of 2 minutes each as the platform is not long enough to cater to the entire rake at one time. CR has announced tenders for the extension of the platform, and work will soon start for the same.

At 1320, the KYN WDG3A was visible at the south end of platform no 7.It had slowly crossed over from the fast downline to the loopline of platform no 7. The rake composition from the engine was as follows: SLR,UR,A1, B2,B1, S10,S9…S2,S1, UR & SLR. Our coach was S8 as well as 8th from the engine. As we had enough time on hands, we boarded the coach after it came to a complete halt and dragged the luggage to our seats. I noticed an old lady of around 65 years and a young boy of 12 years sitting at our designated seats. I informed them that the seats 41 and 44 belonged to us, which they cleared without any inhibitions. We managed to arrange our luggage properly below the seats and settled in comfortably. In the meanwhile I spotted the Hyderabad bound express overtaking us from platform no 5 at 13:25. We left the station sharp at 13:30. We managed to clear the Parsik Tunnel within 8 minutes, in spite of starting from a loopline. After Mumbra Creek, we slowed down to enter the Platform no 5 line at Diva. In the sidings, spotted a diesel triplet of KYN WDM and 2 Moula-Ali locos. We continued to move at a speed of not more than 20 kmph till the Dativali Triangle. Had a good run till Nilje, where track work made it compulsory for us to adhere to a Temporary Speed Restriction(TSR).

Spotted a huge factory on our south side, with tracks connecting it with the Diva-Panvel line. Also spotted a FCI godown on the same side. Mangala Express and an unknown express crossed us before we were made to halt at Taloje-Panchanand at 14:00 alongside a freighter on the platform line. This halt lasted for 15 minutes. We left at 14:15 and crossed Navde Road at good speed, saw lines breaking off to Kalamboli Goods Shed. The Kalamboli passenger lines take a curve around the goods shed and we slowed down to 20 kmph while doing so. Saw Gangotri stationed at Kalamboli. Also spotted a WAG7 driven freighter as we approached Panvel. Came to a halt at 14:30 and managed to leave Panvel’s platform no 7 only by 14:45.


As we left, Panvel, spotted the single electrified line to Karjat moving towards east and lines to Jasai bifurcating from our lines to the west. Soon we were put on loopline at Somatne to allow passage to 6346 Netravathi Express at 14:48. We left at 14:55, crossed Patalganga River Bridge at 15:12, which continued to keep us company on a good 180 deg curve. We crossed Banganga Bridge at 15:21. Crossed Pen at 15:27 and reached Roha, the last station on Central Railway at 16:00. In spite of the innumerable stoppages and slow downs we were late only by 5 minutes. All this meant that there was a lot of slack time built into our train's timetable. I was prepared for a lot of unscheduled stoppages by now. On platform no 1 was a KYN WGG3A with Roha-Diva passenger.

As the sun rays were hitting us straight in the eyes, I decided to down the shutters for some time. We managed to run at a good speed in Konkan Rail territory till 16:40, when we were put on the loopline at Veer. There was a Ro-Ro service stabled on the other loopline. At 16:46, a green liveried WDP3A driven Thiruvanathapuram Rajdhani blasted past us in its customary red liveried ICF coaches, though the generator van had an unmatched livery. I guess it was the last time I would see those Red liveried coaches, as there was news of Chalo Kerala liveried coaches being introduced sometime in mid-january.We left Veer at 16:49. We were again put on the loopline at Karanjadi at 17:00 for the WDP4 driven 23 coacher Mandovi Express, it went past us at 17:16. There was no sign of our train making any movement forward. We stayed put till 17:40 until a Ratlam loco pulled away an unknown express. I was sure that it would take the Kopar-Vasai Route to WR. Finally, we left and crossed innumerable tunnels only to be put on the loop at Diwankhavati at 18:00. The PAS announced a 15 minutes halt for the crossing. This was the first time I was hearing an official announcement of the train being put on the loopline for a crossing. It was the Nagercoil-Gandhidham Express, I guess as it really sped away.

We left at 18:15, reached Khed at 18:30, Chiplun at 18:55 and Savarde at 19:25. We patiently waited for the 2052 Janshatabdi to clear the tracks for us, which blasted past at 19:30.As this is a special train, it didn’t have any pantry car facility, and we had to satisfy ourselves to the only 2 options available for dinner between, Veg biryani and Chicken biryani. We had to halt at Bhoke for 5 minutes at 20:15 to clear the way for a freighter to cross us from the opposite direction. By now I had resigned to my fate. We were halting at every instance of a train approaching us. We reached Ratnagiri at 20:30, halted for only 5 minutes. We halted at Vilavade at 21:20 for a freighter and at 21:40 on the through line at Rajapur Road for receiving the WDP4 driven Konkankanya Express on the platform line. I went to sleep at 22:00 on the Middle berth. As the Goan aunty and the kid who were sitting besides us were to get down at Thivim. Dad occupied the LB and I used the MB on same side to allow them to sit comfortably till their destination. Out train stopped at Pernem at 23:45 and managed to reach Thivim at 00:00 instead of the scheduled time of 22:42. I emptied the MB and occupied the other legitimate LB which we had booked. I knew there were other passengers who were booked for the 2 MB and 2 UB in our aisle. This was the first time; I was experiencing something of this sort. (Only LBs booked and the rest 4 berths were empty). At Thivim, a father-daughter duo came and occupied the 2 UB. I was expecting a good morning now. As we had switched off the tube light in the aisle, I could not manage to converse with them in the dead of the night. At Madgaon, a foreigner couple made their way into our aisle. They were not able to locate their seats, I turned on the light and explained them that they could keep their luggage beneath the LB and recline on the 2 middle berths booked under their names.

I was finally expecting a lot of chit-chat in the morning with the foreigner couple and father-daughter duo in the morning along with a misty morning view of Kerala. Finally had a good sleep and woke up at 06:30 at Barkur, still in Karnataka. We were waiting for a Twin-diesel driven freighter to clear the line for us. As there were not many people near the lavatory, managed to freshen up, just-in time for Suratkal at 07:30. Spotted Mangalore-Verna passenger with Dark Blue coaches with Red stripes. The coaches had KR markings, no SWR markings. After Suratkal, we were moving at a speed of not more than 60kmph for sometime, when I spotted lines breaking off from the KR lines to the west. I didn’t expect Mangalore central lines so soon; these lines might be going to the port, (corrections welcome).Also spotted Twin WDG4 parked somewhere far on those lines. We reached Mangalore Junction (formerly, Kankanadi). As we were having our breakfast of hot idlis and coconut chutney, Yeshwantpur-Kannur Express approached us on the adjoining platform. I prayed, for our departure as I didn’t want to see my train been overtaken. I am sure that in the darkness of the night, we might have certainly been overtaken by the faster running Matsyagandha Express from LTT. Thankfully, we left first at 08:07.

We were held up outside Thokur, the last station under KR territory for 10 minutes. We left the station at 08:27 and crossed the majestic single line Netravathi Bridge at approx 15 kmph. The work on the second bridge is under progress. In the far distance, one can see the road bridge running parallel. On the other side of the Netravathi bridge was a Mangalore Passenger waiting for us to clear the bridge to make its way across this single line bridge. Apparently, double line section of Mangalore-Shornur line starts at the south end of Netravathi Bridge. Within 5 minutes, spotted another north bound train stuck at Ullal. Manjeshwar and Uppala had station names in 4 languages, English, Hindi, Kannada and Malayalam. We crossed Shiriya River at 09:00 and Kumbala at 09:05. Finally, reached Kasargod at 09:13, marking the entry in God’s Own Country.

By now, my fellow commuters had got out of the berths and I try to acquaint myself with them. The father-daughter was traveling all the way to Thiruvanthapuram. They were planning to get down at Kozhikode and catch the faster TVM Janshatabdi. They were certainly not malayalees as they were conversing in Tamil. The girl was a final year student of Civil Engineering. The other couple was German and was on their second trip to Kerala. They were traveling till Ernakulam. Being a rail enthusiast has its pros and cons while traveling. Unknowingly, your attention is always diverted to the window even though the subjects inside the compartment are equally interesting. Soon, I was bombarded with questions like, how much time had we lost and will we reach on time. I was carrying the running timetable of our train, which helped me a lot in answering their questions. I had firm belief in the train recovering all the delays we had incurred till now as there was a lot of slack built into the timetable. I assured the girl that she should certainly be able to catch the TVM Janshatabdi from Kozhikode and also assured the Germans that they will reach Ernakulam by 18:00 as stated in the timetable. My belief stemmed from the fact that the train was given 1 hr between Kuttipuram and Shornur for a modest distance of 30 kms and Thrissur-Ernakulam run was given a complete 3 hrs. Doubling of the line has certainly helped in this sector.

Spotted Kannur-Mangalore passenger at Kolikullam. We reached Kanhagad at 09:30, where TVM-MAQ express was waiting to welcome us. We reached Payyanur at 10:00, late by only 25 minutes. As we were leaving each station, we were slowly making up for all the lost time. At one point, we were delayed by 2.5 hrs at Madgaon. As I was trying to collect information from my fellow German commuters, they said German trains were all like capsules, with no open windows as they traveled at high speeds. The best way to see India was to travel in long distance trains. This certainly made me proud of Indian railways. They opined that the tickets were very cheap and they were very happy to spend the Christmas in Goa and intended to spend the New Year’s Eve in Cochin.

We reached Kannur at 10:30. I spotted the empty rake of the return Kannur-Yeshwantpur Express on one of the platforms. We left Thallasery and Vadagara at 11:00 and 11:28. Now we were late by only 20 minutes and to everybody’s surprise, my prediction was slowly becoming reality. We reached Kozhikode, bang on time at 12:10. The father-daughter duo thanked me for the correct prediction and reducing their anxiety. We crossed the scenic Ferok bridge at 12:25, Tirur and Kuttipuram arrived at the scheduled timings. The double line section become a narrow single line between a few metres of north of Kozhikode station and continues to be so till a few metres of north of Kallayi. This is a potential bottleneck on this otherwise double line. As we had to cover a mere 30 kms for a running time of 60 minutes between Kuttipuram and Shornur, I was sure that we would soon be put on a loopline before Shornur, as it is one of the busiest station in Kerala and Railways will certainly not allot a platform for longer duration especially a least important winter special train. As expected we were put on the loopline at Karakad. We were held up for 20 minutes and finally managed to reach Shornur late by 10 minutes. As the train was running till Ernakulam, there was no traction change at Shornur, we continued with our faithful KYN WDG3A. Finally, managed to reach Thrissur at 15:18, late by only 18 minutes as we had a few speed restrictions between Punkunnam and Thrissur. Also, managed to spot the single electrified line to Guruvayur bifurcating from the mainlines towards west. The most evident thing in the run between Shornur and Thrissur is the Bharatapuzha river bridge and the level at which the 2 lines are laid. There are innumerable curves on this section and the double lines for the most part of the journey run at different levels.

Thrissur, as usual, was neat and clean. Even though, it has only 3 platforms, it a very important station on the map of Kerala and all the trains have a halt at Thrissur, except one. We alighted at platform no 1 and pulled our luggage out from the Main exit of the station. There were policemen guarding the gate and soon we managed to hire an auto to our house which is barely 2 kms from the station.

We rang the door bell and as soon as the door opened the excitement/astonishment on the face of my mom and our relatives were priceless. We had traveled all this way to catch this expression on their faces. The journey was truly fulfilling….


Nikhil Padinjaroot Karunakaran

Sunday, December 6, 2009

Trans Mumbai Metropolitan Region On A Lazy Sunday

MAP COURTESY: MMRDA WEBSITE




It was the Sunday of 22nd November 2009 and I had got an off from office after a gap of 14 days. The last 14 days included many a shifts of more than 11 hrs and a marathon 38 hr shift after a server crash. I was in no mood to go anywhere on this much desired and anticipated off-day. On Saturday morning, I had a special request from a friend of mine to join him to go to Virar for checking out a few housing options. I tried to dissuade him from taking me on this long trip from my home, Dombivli. I tried to make him understand that I desperately needed rest. But he was in no mood to relent. Finally, I decided to give in to his demands. After all, I wanted to maintain the dignity of the proverb,” A friend in need is a friend indeed”.

So the plan was to go to Virar and visit a few properties, before heading back home to Dombivli. My friend, Babu was doing the night shift at office located at Cuffe Parade(Churchgate), Mumbai and he was to take a train to Vasai from Churchgate. Detrain at Vasai, and wait for me to join him at 11:05 at Vasai platform no 5, north end. Accordingly, he woke me up at 8:00 am in the morning and told me that he would be taking the Virar 9:35 Fast. I told him that I will take the 10:08 am MEMU service from Kopar. This was the first time I was travelling by a MEMU. The rakes are not as broad as the mainline EMU in the Mumbai suburban section, but are comfortable enough. I left home at 9:25 am, took a share auto and reached Dombivli station (East) at 9:40 am. I normally avoid travelling between 10:00 and 16:00 hrs on Sundays by CR as megablocks on the varied sections of CR tend to slow down the few services that operate during this period. There are a number of locals which stay cancelled or get delayed during this period. Most importantly, the crowd on Sunday is very little knowledgeable about travelling by EMUs as often we see the entire families travelling on an outing. On weekdays everyone knows where to stand, what a T,ST,C,K,A,AN,TL,N,S,KP,BL on the indicator stands for, how fast to alight or which side the next station comes, on Sundays all these trivial things are handled haphazardly as not all are habituated to the travails of the Mumbai EMUs.
As I carry a First Class season ticket pass from Kalyan to CST Mumbai, I take the CSTM end first class to go to office, but today I was planning to get down at Kopar, hence decided to take the Kalyan End First Class. After alighting on Platform no 3 from the skywalk connecting the Kalyan End FOB to Dombivli east, I headed straight to the Yellow/Red stripe markers on the iron pillars (which indicate First Class compartments). The station was choc-a bloc with families waiting for the next local in CSTM direction. The Indicator mentioned the next EMU,9:45 Semifast to CSTM. It was delayed by more than 5 minutes now. One can see the EMU departing from Thakurli as it is downhill from Dombivli. I was getting nervous, since I had to also buy tickets to Vasai at Kopar for the MEMU train. The EMU that pulled in was a Taxi-face MRVC local and after a brief halt of 30 seconds we left. The distance between Kopar and Dombivli is very small. The EMU did accelerate well even though it had to cover a very small distance. Reached Kopar (lower level) at 9:53 and I rushed to the ticket counter situated on the Kopar(Upper level) to stand in the queue. The MEMU service arrives on the Upper level on platform no 3. I do have a Suburban Smart Card, but it is not valid for the Kopar-Vasai section as the CR is still maintaining it as a Non-suburban section. There were many people wanting to buy tickets from the lone ticket counter that was open. I did see many commuters using the CVM machines to validate the coupons, I doubt if these can be used in this section. I waited patiently in the queue. There were a few restless commuters who were jumping the queue as after the MEMU service, there is no train till 14:35. They were greeted with the choicest of abuses by a few in the queue. The lady at the counter was very good at dispensing tickets. She managed to issue tickets at lightning speed. Finally after a nervous 10 minutes in the queue, got the tickets to Vasai Road. The expected time of arrival for the MEMU at Kopar is 10:08 hrs, it was 10:10 by the time I managed to touch down on the platform no 3. Soon the announcement of the MEMU departing from Dativli( a station on the Kopar-Panvel line ) was blared by the PAS. I decided to walk the entire length of the platform. There was a sizeable crowd waiting for this service. It was heartening to see the commuters lapsing up this MEMU service as the only other way to reach Vasai by train earlier was to take the long entourage from Dombivli to Dadar(CR) and then Dadar(WR) to Vasai Road. Below the bridge on the Lower level one could frequently see the EMUs making their way in an out of the Kopar platforms 1 and 2 on the mainlines. The MEMU finally arrived with its horns blaring at 10:16 am. Not knowing exactly the position of the coaches I waited patiently till it slowed down to a complete halt. I was happy to notice that there were a few empty seats.
Most often the difference between a window seat and a standing accommodation is a fraction of a second. A seasoned commuter always times his jump into the train to perfection, has eyes wide open to quickly locate the empty seats around, a micro-second decision to weigh the pros and cons of various seats pertaining to wind direction and sun rays and finally, brisk and athletic legs to plunge into the seat. I too timed by jump to perfection and managed to jump in to the most coveted seat in the compartment, a Window Seat. I was very happy to have achieved this feat. Soon the compartment was filled and there were 4 persons occupying the 3 seaters. Sitting beside me was a family of 9 individuals which included 2 kids (a 9 year old boy and a 7 year old girl).The kids were a restless lot, which I soon learned as soon as the MEMU left after a 2 minute halt.
I was experiencing the MEMU for the first time, and it did not disappoint me at that. The coach had seating of 3 X 2 facing each other. Luckily the seats were cushioned and the best thing was that the windows weren’t grilled and were very wide as compared to the normal EMUs that we commute on in Mumbai. I have this habit of resting one elbow on the Window pane and leaning out of the window to see the world outside and as usual followed the ritual. Today, I had compete with 2 young kids who were sitting beside me. I knew that they were jealous of me, for the coveted window seat which I had made mine. The girl, Ankita decided to forego here seat and rather stand next to the window. She should in the middle and blocked my uninterrupted view of the world outside. I was a bit irritated but was helpless. More annoying fact was that her hair was flying straight into my face. I had no options but to back-out and remove my elbow from the window pane. The MEMU had by now slowed down near the LC gate and the place where the infamous Gandhidham-Bangalore Express had derailed a few days back. It picked up speed and crossed the Ulhas river bridge and soon the Godown capital of Maharashtra, Bhiwandi Road (Station Code: BIRD) was visible. The MEMU halted for a brief 2 minutes. Many people got down here. Again we left with good acceleration. The way this little girl was clinging onto the window, I hoped she will soon join the IRFCA group. Her elder brother, Ankit was increasingly getting jealous of her. He was constantly pulling Ankita back to her seat so that he could take her position. She was adamant. Finally, Ankit complained to the other family members and managed to pull her back. The problem with this guy was that he was taller than the height of the window so even though he managed to get the window, he could not see outside unless he bend down, inconveniencing me. Finally, I suggested that he kneel down and he would get the best view. I had a hidden agenda in punishing him as; it would invariably make my view wider and clearer. We did stop enroute at Khaman Road and Karbhau. The entire Ghodbunder road with its tall buildings can be seen in the far south from Kharbhau. We did cross the Mumbai Ahmedabad Highway enroute. After the stop at Juchandra, the entire Western Railway mainlines can be seen fast approaching us from the distance. I did spot 2 MRVC locals making their way to Vasai Road while we were slowly but surely reaching Vasai. The entry to Vasai was painfully slow as there is a speed restriction. We reached Vasai by 11:05 am. After Juchandra halt, I was constantly ringing up my friend to know his status on the MRVC local that he had boarded from Churchgate. Soon, I was convinced that I would be the first person to reach Vasai as he had only crossed Mira road, when I had left Juchandra. I decided to quickly take the FOB at the north end and get down on the east side of the station. The FOB is very narrow and was choc-a bloc with commuters who had detrained from my train. On the east side, there is a ATVM amchine, I soon took out my Smartcard and collected the printed tickets till Virar. Again took the same FOB and got down on Platform no 2.By now, it was clear that the next EMU expected to Virar was the one in which my friend was travelling. I advised him to stay back in the train and I will catch him at Virar. An MRVC local with the yellow taxi face made its way into the station and it was relatively empty (by Mumbai standards). I deliberately decided to stand in the corridor as I wanted to spot the upcoming Virar Car shed on the West side. The ride was good and direction indicator in the Emu also mentioned it to be a W.R. We don’t see such a thing in CR, which only indicates the next station and the destination station. After Nallasopara, on the west side, I could see for the first time, what could soon become a busy Virar Car-Shed. I guess 50-70 % work is over.
My EMU slowly entered, platform no 1 at Virar. The exit from the Virar station was as chaotic as I had seen a few years back. I noticed that MMRDA was in the process of laying and connecting the FOB to the new skywalk, which was under construction. Met my friend at the station entrance and spend the next few hours scouting for new / resale properties in the vicinity of Virar West. By the time I managed to reach Virar back, it was 14:00. Both the local platforms 1 and 2 had trains scheduled for departure.14:10 Churchgate Fast and 14:16 Dadar Fast. Since, my friend had to go back to Churchgate, we boarded the 14:10 fast local after vending out my tickets to Borivali from an ATVM Machine.
I could have gone to Vasai and taken the DMU back to Kopar at 15:35, but since I had already wasted ½ a day in commuting, I decided to explore some new avenues. The BEST undertaking had introduced the AC 700 Service from Borivali to Thane, a few months back and I wanted to try it out personally. When, I used to stay at Thane, I was a frequent traveler by the BEST AS 4 Service to Backbay Depot. It used to drop me in front of my office at World Trade Centre in 1.5 hrs-2 hrs. The ride in the 7:30 am bus ensured that I touched down in office before 9:30 am. The best thing about this service is that it has very few stops and AC for comfort along with TV/radio service. The seating arrangement too is far more comfortable and has wide windows to view the outside world. Before BEST Service 700 LTD came into being the long Borivali-Thane commute was only possible by a crackling State Transport Bus. Mind you, these buses were so bad in terms of interiors and exteriors, we used to call it “khatara bus”, but the only 2 things that I liked about these ST buses were their rash drivers and their engine upkeep. The ST bus drivers need to be saluted for the way they drive the buses in spite of all the problems. One look into the driver’s steering and the gear handle will make you understand what I am really talking about.
Anyways, our Churchgate fast, a DC local left at 14:10 and managed to reach Borivali by 14:43. I bid goodbye to my friend and took the North End FOB to find the Bus-stop for AC-700 service. Large scale construction work could be seen at the eastern entrance of the station, with regards the remodeling of platform no 6 and the new platform 6A.As I was getting down from the FOB, I noticed the AC-700 standing in the middle of the road. I could see that the bus was fairly filled with commuters and there was only space for standees now. I decided to wait for another bus as it made no sense in travelling the complete route standing after paying for the AC fare. It was 14:50 by now and the Bus-Stop Flag mentioned the service to be running at a frequency of 15-30-15.in the worst case scenario, I expected the next bus by 15:15. All the bus stops were without a roof and there was just a Bus-stop-Flag to indicate the particular BEST service. I understand it could be because of the railway remodeling work, adjacent to this road.
I was the first one in the line and next to me were a family of 3, a father, mother and their teenage daughter. The line of commuters was becoming longer by the minute. It was 15:05 and there were no signs of the AC bus approaching. The service actually starts from Magothane Depot and reaches Borivali East station enroute, though 99 % commuters get in here. So all of us were looking in the south direction for the Bus to appear on the horizon. I noticed that the teenage girl was very restless and was moving back and forth in the line. Her mother was continuously giving here menacing stares for doing so. Her father, though was unperturbed by all this. The girl and her mother were discussing something in Malayalam and the anxiety to give in an ear to their conversation was growing. Finally, I could understand that the girl wanted to visit the loo and her mother was scolding her for not anticipating the same before leaving their house. They did not know that I too was a malayalee and was getting the gist of their conversation. Her mother was adamant on waiting for the bus as the line had become too long by now and if they forego it to visit the loo, they would not be able to join back. But, the girl was understandably under tremendous pressure. After a lot of deliberation, the girl managed to persuade her mother to break the line and they told me that they will be back in a minute. I agreed, but told them in no uncertain terms that if the bus arrives before them then, I would not be able to vouch for them. I could see that they were heading back to the station. They returned back after 10 minutes and I somehow managed to convince people around that they were indeed in the line. They were happy with the vocal support. Finally at 15:30, I was the first one to catch a glimpse of the bus at the south end of the station. For a tongue-in-cheek remark, I shouted, “ ohhh… bus vannu…”( ohh… finally the bus has come… in malayalam). The expression on the face of the mother and daughter was worth seeing. They must have realized that I had understood all the quarrelling they had before visiting the loo. I had deliberately shouted in Malayalam to get that expression out of them. Cruel me…….
I decided to take the 3rd last window seat, as the suspensions of the Kinglong buses used for the AC services are indeed good. They are run on CNG, the only grouse is the initial acceleration. The bus struggles to pick up speed instantaneously as opposed to the other buses purchased by BEST under MUTP Phase –I. but, once the Kinglong hits the highway, it shows its true potential. By the time, the bus was ready to leave it was filled to the brim. The latest modification in these buses being a large central pneumatic door, under instructions from the state government, after a school bus fire in the recent past. This has reduced the number of seats in the buses by at least 4. There were more than 25 people standing in the bus. The middle class in Indian metropolises has certainly boomed. So many people were ready to shell out that extra for a comfortable ride. The bus fare was a flat Rs. 50 /-. There was a traffic jam at the entrance of the MSRDC(ST) stand and by the time we reached the Western express highway(WEH), we had lost 15 minutes. The real ordeal started after that. We took an agonizing 50 minutes to commute the distance till the entrance of Ghodbunder road. There were large scale traffic jams on the WEH as the flyover construction work was in progress in the middle of the road. To add to the agony were some haphazard parking by private vehicles and Private Tour Operators. Dahisar Check naka was chaotic as ever and the junction at the entrance to Mira-Road continues to be the problem area. The traffic was bumper to bumper at these locations and the bus was crawling. By the time our bus took a right turn to Ghodbunder Road, it was 16:40 hrs. If I had waited at Vasai for the 15:35 DMU, I must have surely reached Kopar by then. No point in thinking about the bygones.
Ghodbunder Road is an important road as it connects Thane to Borivali in the shortest possible way; the other alternatives are really dreadful, the less frequented Mulund-Goregaon Link road, the new Vikhroli-Jogeshwari link road, or the painful entourage via Sakinaka-Chakala and Andheri. MSRDC has done a splendid job in maintaining the road pothole free. At certain places we traverse through the Sanjay Gandhi National park. The road has been cut through the rocks on south side and we have the Thane creek as a faithful companion on the north side. It’s a nature lovers delight, but equally scary in the night. At certain places we do see the Road signs of “Beware of the leopard”. As soon as the Bus enters the Thane Municipal Corporation (TMC) limits it becomes the widest road in Maharashtra. All thanks to the erstwhile commissioner of Thane, T. Chandrasekhar. The residents of Thane have a lot of respect for this person. He was instrumental in the makeover of the once sleepy town of Thane into the present day modern urban conglomerate. My bus was speeding through the highway, like there was no tomorrow as we were very late. Soon the forest and creek side gave way to huge complexes, malls, service centers and skyscrapers as we neared Kaburbawdi. I learn that TMC is building a flyover at this junction to ease the commute for citizens as long distance plying trucks can then take the flyover, to avoid the city traffic.AC 700 service uses the unconventional way of reaching Thane station as it does not terminate on the West side of the station. It takes the Eastern Express highway(EEH), right up to the gates of Mumbai traversing over the Kopri Rail Bridge and reaches Thane’s Anand Dighe Praveshdwar and make a U turn to reach the Thane Station East. When the bus was running parallel to the railway tracks, I spotted a late scheduled Sinhagad Express due to girder work at Karjat between 10:00 and 15:30 hrs.It was 17:30 and by the time I alighted from the Mulund End FOB to platform no 5, the WCG2 driven Sinhagad had come to a halt. After an unusual 10 minute halt, it left and I was waiting to see the next scheduled fast train as the timetable goes for a toss on Sunday at CR. Fortunately, the 17:10 Badlapur fast was scheduled next. I boarded the Kalyan End First class and stood by the side of the door. Instead of the customary 13 minutes the EMU took 23 minutes before reaching Dombivali. We halted twice before Parsik tunnel and once before Diva LC gate. Alighted from the EMU at 18:05, took a share auto and reached home at 18:20. Thus bringing to an end a long and tiring journey through a small section of Mumbai Metropolitan region. I am a maverick when it comes to discovering the alternative routes. Whenever I have time on hand, I make it a point to travel by the unconventional and alternate routes just to discover them.
-Nikhil Padinjaroot Karunakaran
Dombivali(+91-9819250516)